Share Listing   Show Commission
  Edit Listing
Last updated on March 10th, 2026

20 +/- Acres Heavy Industrial White, Georgia

$2,400,000 $120,000 Per Acre

458 Old Tennessee Hwy NE, White, Georgia 30184


Land Size20 Acres
ZoningInd-H City of White
WaterCity of White
SewerCity of White
ElectricGeorgia Power 3 Phase

Zoning: Ind-H – City of White (Heavy Industrial) Buffer Reduction In Place

Utilities:

· Georgia Power – 3 Phase Power

· City of White – Main Line Sewer (2 Taps)

· City of White – Water

· City of Cartersville – Natural Gas

Topography: Level

Rail: Borders CSX – See CSX Letter Regarding Availability

Location & Logistics:

· 3.1 Miles to I-75 Exit 293 (US Highway 411)

· 49.9 Miles to Atlanta, GA

· 299 Miles to the Port of Savannah

· 47.1 Miles to Appalachian Regional Port (Inland Rail Port – Crandall, Murray County, GA)

· 60.6 Miles to Hartsfield-Jackson Atlanta International Airport (ATL)

· 60.6 Miles to Chattanooga Metropolitan Airport (CHA)

Property Overview

Hard-to-find heavy industrial land in Bartow County. This parcel offers an exceptional location within one of Northwest Georgia’s fastest-growing industrial corridors. With Ind-H zoning, strong utility infrastructure, rail adjacency, and nearby interstate access, the property is well positioned for manufacturing, distribution, or other heavy industrial uses.

An outstanding opportunity for investors, developers, and owner-users seeking strategically located industrial land in the I-75 logistics corridor. Coordinates: 34.280284, -84.751512

All information contained herein has been obtained from sources deemed reliable; however, neither seller nor broker makes any warranties or representations as to the accuracy of the information. Prospective buyers should conduct their own independent investigation and due diligence regarding all aspects of the property.

Sec. 34-131. IND-H Heavy Industrial District.

(a) Purpose. The IND-H district is established primarily to encourage the development of

heavy industrial uses, as distinct from general industrial uses.

(b) Area, yard, height and buffer requirements. The following requirements apply in the IND-H

district:

(1) Minimum lot size: one acre, or as required to meet buffers.

(2) Reserved.

(3) Front yard setback (from right-of-way): 40 feet.

(4) Side yard setback (from property line): 20 feet.

(5) Rear yard setback (from property line): 20 feet.

(6) Maximum building and structure height: 75 feet.

(7) Buffers: 500 feet when adjacent to residential districts or O-I district, 100 feet when

adjacent to the C-1 or C-2 district, and 50 feet when adjacent to the IND-G district.

(c) Buffers. Buffer standards, and regulations regarding use and crossing of buffers, are

located in section 34-152.

(d) Height exceptions. The height limitation does not apply to structures such as unoccupied

and inaccessible architectural features on nonresidential buildings (e.g., church spires,

belfries, cupolas and domes), monuments, government-owned observation towers, water

towers, chimneys, flag poles, aerials, and similar structures. Specific height requirements

apply to signs and structures containing signs; see article IX of this chapter.

(e) Building area. All industrial operations in the IND-H district must occupy a building or

structure, of a minimum of 800 square feet.

(f) Development plans. Development must be in accordance with the city development

regulations. The engineering department should be consulted. Uses in this district are subject to special building code requirements, and the city building inspections


The information contained herein is from sources deemed reliable, but is subject to errors, omissions, and withdrawal without notice.

Top of Page